Overcoming the problem of slag blocking failure is a key breakthrough in improving the efficiency, purity, and economic benefits of converter steelmaking. The following systematically elaborates on this innovative achievement from three aspects: technical principles, solutions, and industry impact:

Slag blocking plug

1、 The core pain point of slag blocking plug failure

Failure manifestations: premature melting/erosion of slag blocking plug (resulting in slag discharge>3kg/t), insufficient mechanical strength (installation fracture rate>5%), poor matching with steel outlet (slag leakage rate>15%).

Industry losses: An increase in slag discharge per furnace will result in a 2-3% decrease in alloy yield, a 30% increase in the risk of excessive inclusions, and an 8-15 yuan increase in the cost per ton of steel.

2、 Key technological breakthrough path

(1) Innovation in Material Systems

Composite ceramic matrix: Adopting MgO-Al ₂ O ∝ - ZrO2 ₂ three-phase eutectic structure (ZrO ₂ content 18-22%), the refractoriness is increased to 1850 ℃ (traditional material 1600 ℃)

Nano coating technology: Surface spraying of 200 μ m titanium boride coating improves corrosion resistance by 40% (laboratory data)

Transition layer of metal ceramic: achieving thermal expansion coefficient matching between steel core and refractory material through gradient sintering technology (CTE difference<0.5 × 10 ⁻⁶/℃)

(2) Structural optimization design

Fluid dynamics simulation: slag steel two-phase flow simulation based on ANSYS Fluent, optimizing head cone angle (55-60 °) and vent hole distribution

Intelligent warning system: embedded with micro thermocouples (response time<0.5s), real-time monitoring of changes in plug temperature field

(3) Process control upgrade

Accurate casting model: Establish the motion trajectory equation of the slag blocking plug (considering 12 parameters such as ladle inclination angle and tapping speed), and control the casting timing error within ± 0.3s

Laser positioning assistance: ToF laser rangefinder (accuracy ± 1mm) is used to ensure installation coaxiality

3、 Industrial application effectiveness

Actual measurement data of 300t converter in a certain steel plant:

The lifespan of slag blocking has been extended from 8 minutes to 15 minutes

The slag discharge rate has decreased from 4.2kg/t to 1.6kg/t

The endpoint [O] content decreased by 12ppm

economic performance:

Alloy consumption reduced by 1.8kg/t steel

The cost of refractory materials has decreased by 23%

Annual benefits reach 27 million yuan per converter

4、 Technological extension value

Promote standard upgrade: The newly revised "YB/T 5049-2023 Technical Specification for Slag Blocking in Steelmaking" has adopted this technical indicator

Intelligent steelmaking connection: provides key execution unit reliability guarantee for the subsequent unmanned steelmaking system

Cross industry application: technology derived to scenarios such as continuous casting intermediate ladle plug rods, molten iron pretreatment spray guns, etc

Message content

Add: 513 Yucui Road, Yushan District, Ma'anshan City, Anhui Province

 

Leave a Message

25 Years Dedicated to Ladle Slag Barriers Serving Steel Mills with Intelligent Steelmaking Solutions

%{tishi_zhanwei}%